Close Menu
    What's Hot

    Modaxo Appoints Ian Woodroofe as Chief Strategy Officer

    October 2, 2026

    AL MOUJ MUSCAT ADVANCES BUSINESS GROWTH AS FULLY SOLD BUSINESS PARK MOVES TOWARDS OCCUPANCY

    October 2, 2026

    HOP Events Unveils Global Cultural Vision, Targeting 25 Cities and 250 Experiences Annually

    October 2, 2026
    Gulf News ServiceGulf News Service
    • Automotive
    • Business
    • Editorial
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Gulf News ServiceGulf News Service
    Home » Gotion Secures 75% of Saudi Arabia’s First Utility-Scale BESS Tender
    PR Newswire

    Gotion Secures 75% of Saudi Arabia’s First Utility-Scale BESS Tender

    September 28, 2026
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    Chinese battery maker takes 75% of capacity with 25-year system life and desert-engineered storage technology.

    RIYADH, Saudi Arabia, Sept. 28, 2026 /PRNewswire/ — Saudi Power Procurement Company (SPPC) has awarded China’s Gotion High-Tech 6 GWh in the kingdom’s first utility-scale battery storage program—about 75% of the total tender, signaling how seriously Saudi Arabia is pursuing its 2030 energy transition goals. The G1 project totals 2 GW/8 GWh and is valued at roughly $1.16 billion. Gotion secured all three core sites—Al Muwayah, Haden and Al Kahafa—each 500 MW/2 GWh, making it the largest single technology supplier.

    The contract marks the first international large-scale deployment of Gotion Grid, its utility-scale storage system. Gotion says its edge is not price but engineering for extreme conditions. The system operates from -30°C to 55°C, uses a desert-optimized thermal management system that maintains full output during sandstorms and cuts high-temperature degradation by 40% versus conventional systems. It offers a 25-year design life, 25% longer than the industry average of 15–20 years, eliminating mid-life equipment replacement—a key factor for BOO contracts requiring 20-plus years of operation. An AI-powered battery management system enables intelligent dispatch, proactive safety warnings and full lifecycle diagnostics. All three sites can be remotely operated and integrated into Saudi Arabia’s 380 kV backbone grid.

    For investors, the award signals three shifts. Saudi storage procurement is moving faster than expected; G1 is awarded and G2 is underway, positioning Gotion for further phases. Competition is increasingly focused on lifecycle economics and extreme-environment performance over upfront pricing. Gotion is also building a regional footprint: roughly 9 GWh across the Middle East and North Africa, including a 1.5 GWh BESS in Egypt with a planned 3 GWh local manufacturing base, and a 1.2 GWh Morocco project with ACWA Power. Globally, its cumulative system-level storage projects exceed 10 GWh, including a 281 MW/843 MWh solar-storage project in Australia under construction and expected to reach commercial operation in 1H 2027.

    The Saudi award does not appear to be a one-off. As renewable penetration rises and grid stability becomes a priority, G1’s technical standards are likely to carry weight in future tenders. The question for Gotion is whether it can convert its early lead into sustained regional market share.

    Cision View original content:https://www.prnewswire.co.uk/news-releases/gotion-secures-75-of-saudi-arabias-first-utility-scale-bess-tender-302891502.html

    Related Posts

    Modaxo Appoints Ian Woodroofe as Chief Strategy Officer

    October 2, 2026

    AL MOUJ MUSCAT ADVANCES BUSINESS GROWTH AS FULLY SOLD BUSINESS PARK MOVES TOWARDS OCCUPANCY

    October 2, 2026

    HOP Events Unveils Global Cultural Vision, Targeting 25 Cities and 250 Experiences Annually

    October 2, 2026

    Engineering the Extraordinary: XCMG Supports Landmark Twisting Tower Project in Egypt’s New Administrative Capital

    October 2, 2026

    Angel Aligner Upgrades Torque Ridges to “Pressure Points” in Europe

    October 2, 2026

    Diego Mesa Puyo takes over as CEO and Chairperson of the Global Environment Facility

    October 1, 2026
    Latest News

    EU proposes secure EUCCS network linking first responders

    October 1, 2026

    – The European Commission has proposed a new EU Critical Communication System to connect first responders across European borders. The plan would link national networks used by police, firefighters, emergency medical services and civil protection teams. It covers all EU

    India expands naval reach and maritime security role

    October 1, 2026

    DR Congo Ebola count reaches 8,067 cases across 7 provinces

    September 30, 2026

    India-US trade talks take center stage at G20 meeting

    September 30, 2026

    Suleiman Khan alleges tyranny before PTI Islamabad march

    September 30, 2026

    UAE and Zambia deepen economic ties in Abu Dhabi talks

    September 30, 2026

    flydubai showcases growing Syria network at Damascus show

    September 29, 2026

    Sheikh Saif meets Interpol president on margins of world event

    September 29, 2026
    © 2026 Gulf News Service | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.